This page lists Geoff's "Monograph 2004-2013: 10 Years, 100 Projects" chronologically. Outside of his Lafayette work, projects completed from 2014 on will be listed in a future update. His current work in Lafayette will be presented in a separate, future portfolio.
1. East Village Area Redevelopment Plan
Location: Calgary, Alberta
Size/Description: 115 acre Downtown (DT) Redevelopment Plan and Form Based Code (FBC) (Adopted-Under Construction)
Role: (Independent Subcontractor) Principal Author in Association and as Subcontracted by Jenkins Architecture.
Commentary: The project scoop, coming soon.
<2004>
2. Silvertip Village
Location: Canmore, Alberta
Size/Description: 65 acre (TND) Mixed Use Town Center (MUTC) resort village (RV) modeled after medieval design principles. Included extensive Master Plan, Architectural Code, and Form Based Code (FBC)
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2004>
3. International Avenue Design Initiative
Location: Calgary, Alberta
Size/Description: Redevelopment plan for over 4,000 acres along a 4-mile urban corridor. The extensive corridor and neighbourhood redevelopment plan included a seven day Charrettte, Master Plan, and Urban Code. Corridor Plan Adopted and Funded. Recipient of the 2005 CNU Charter Award. (Funded, Under Construction)
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2004>
4. Eagle Ranch Resort
Location: Invermere, Alberta
Size/Description: 400 acre. (TND) Mixed Use Town Center (MUTC) resort village (RV), Design Guidelines;
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2005>
5. Red Deer County Rural Conservation Community
Location: Red Deer County, Alberta
Size/Description: 440 acre (TND) conservation community plan and workshop
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2005>
6. Airdrie Mixed Use Centres Design Guidelines
Location: Airdrie, Alberta
Size/Description: City-Wide Design Guidelines and Urban Code as part of the City’s Smart Growth Strategy (Adopted)
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2005>
7. Dalhousie Station
Location: Calgary, Alberta
Size/Description: 17 Acre (TOD) Suburban Retrofit (SR) redevelopment study (Under Construction)
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2005>
8. VENU
Location: Rocky View County, Alberta
Size/Description: 7 acre walkable neighborhood center for an otherwise conventional residential subdivision. (Substantially complete)
Role: As Manager, Co-Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2005>
9. IADI Charrette 2: 50th Street Urban Centre, Calgary, Alberta
Location: Calgary, Alberta
Size/Description: 100 acre (TOD) Suburban Retrofit (SR) redevelopment study inncluding an extensive Master Plan and 5-day
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2006>
10. Heritage Station TOD
Location: Calgary, Alberta
Size/Description: 6.2 acre greyfield TOD and surrounding station area redevelopment plan developed through a 4-day charrette. Recipient of the 2008 Canadian Urbanism Institute Brownie Award for Public Process.
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2006>
11. McKinley Resort and Mixed Use Community
Location: Kelowna, British Columbia
Size/Description: 1200 acre TND, mixed-use hill town village and mixed-use neighbourhoods, and transect-based form based code (FBC) (Under construction)
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2006>
12. Buckley Village
Location: Rocky View County, Alberta
Size/Description: 83 acre rural conservation TND community
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2006>
13. Lauderhill SmartCode
Location: Lauderhill, Florida
Size/Description: City-Wide SmartCode calibration and Corridor Redevelopment Plan (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2007>
14. Rose Manor
Location: Salado, Texas
Size/Description: 160 acre village-scaled TND (Under Construction)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2007>
15. Lawrence, Kansas SmartCode
Location: Lawrence, Kansas
Size/Description: City-Scale SmartCode and Master Plan with 7-day Charrette.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2007>
16. Auburn Bay Station Area Plan
Location: Calgary, Alberta
Size/Description: 83 acre TOD
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2007>
17. Providence Transit Corridor
Location: Calgary, Alberta
Size/Description: 400+ Acre TOD Master Plan and BRT corridor design. After winning a consultant-level design competition, the firm was selected to move forward on a comprehensive two-mile long BRT (Bus Rapid Transit) corridor design and associated TOD plans.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2007>
18. Bridgegate Resort Village on Crowsnest Lake
Location: Crowsnest Pass, Alberta
Size/Description: 22 acre (TND) Mixed Use Town Center (MUTC) resort village (RV). Included Policy and Land Use approvals .(Adopted).
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2007>
19. TwinHills
Location: Calgary, Alberta
Size/Description: 220 acre mixed use center, TOD, and TND plan. Includes BRT corridor, technology campus, and integrated LID principles. (Adopted)
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2007-2013)
20. Plan 8 Development Study
Location: Rocky View County, Alberta
Size/Description: Development study for a rural Sub-Regional Plan (Over 8,000 acres), form-based code, and village community plan.
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2008>
21. Taos SmartCode
Location: Taos, New Mexico
Size/Description: City-Wide Smart Code Calibration (FBC), Urban Design Manual, and local area plans through 7-day charrette. (SmartCode adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
22. Bruderheim TND
Location: Bruderheim, Alberta
Size/Description: 160 acre TND Neighbourhood Design, Form Based Code, 5-Day Charrette, Policy Approvals
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2008>
23. Springbrook Urban Design Plan
Location: Red Deer, Alberta
Size/Description: 1,235 acre comprehensive urban design plan for a hamlet and regional airport on a former Air Force base. Included a TND and Downtown Master Plan, demonstration Form Based Code (FBC) based on the SmartCode, and a 4-day Charrette (Approved)
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2008>
24. El Paso SmartCode and BRT Corridor Design
Location: El Paso, Texas
Size/Description: City-Wide SmartCode Calibration, BRT Corridor Code and TOD design. (SmartCode FBC adopted 2008)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
25. Florence Gardens
Location: Gulfport , Mississippi
Size/Description: 320 acre, 3-neighborhood TND (Under Construction)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
26. Hemet Stock Farm
Location: Hemet, California
Size/Description: 60 acre infill TND neighbourhood
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
27. Eagle Ranch Settlement
Location: Invermere, Alberta
Size/Description: Detailed plan for a 6.0 acre mixed use resort settlement within the Eagle Ranch TND resort master plan.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
28. Hutto SmartCode
Location: Hutto, Texas
Size/Description: City-wide SmartCode calibrtion and neighborhood master plan through 4-day charrette. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2008>
29. Ollerenshaw Ranch
Location: Calgary, Alberta
Size/Description: 4 acre urban agriculture center within a new suburban residential community. (Adopted)
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2008)
30. Winter Park SmartCode, Winter Park, Florida
Location: Winter Park, Florida
Size/Description: City-wide SmartCode
Role: As Lead Designer, SmartCode advisor as sub consultant to Canin Associates
Commentary: The project scoop, coming soon.
(2008)
31. Cochrane Lake Hamlet Plan
Location: Rocky View County, Alberta
Size/Description: 1265 acre Comprehensive 6-neighborhood (TND) Hamlet Master Plan, Hamlet Policy Plan, Form Based Code (FBC) and 5-day charrette. (Adopted)
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2009>
32. Aldea
Location: El Paso, Texas
Size/Description: 200 acre TND mixed use town center organized around a Wal-Mart site. Previously known as Miner Village.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
33. Montecillo
Location: El Paso, Texas
Size/Description: 315 acre infill mixed-use town center and TND neighborhood approved under El Paso’s SmartCode.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
34. Ka’U
Location: The Big Island, Hawai’i
Size/Description: 1,000 square mile (661,783 acres) Sub-regional district plan (Community Development Plan) developed through a 7-day charrette process and based on the SmartCode for regional planning and form-based land regulations.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
35. San Marcos, Texas SmartCode
Location: San Marcos, Texas
Size/Description: City-wide SmartCode calibration, detailed site design, downtown regulating plan, developed through a 5-day charrette. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
36. Belleview, Kentucky SmartCode
Location: Belleview, Kentucky
Size/Description: City-wide SmartCode/Form Based Code calibration, detailed site design, downtown regulating plan, developed through a 4-day charrette. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
37. Kona-Honokohau Village TOD
Location: The Big Island, Hawai’i
Size/Description: 68 acre Transit Oriented Development (TOD) in conformance with the County’s Village Design Guidelines (Based on the SmartCode) as part of a 5-day charrette. Includes development of the “Article 3” submission for zoning approvals. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
38. Winnipeg City Building Charrette
Location: Winnipeg, Manitoba
Size/Description: City-wide urban design study and public charrette process for City’s ongoing “OurWinnipeg” city planning process as part of a 5-day charrette. Included TND, SmartCode, TOD, and infill/surburban retrofit explorations.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2009>
39. Urban Shift, Calgary, AB
Location: Calgary, AB
Size/Description: City-wide In-Depth Analysis and Assessment for Implementing Smart Growth principles in Calgary
Role: As Lead Consultant, Co-Authored with Gian-Carlo Carra
Commentary: The project scoop, coming soon.
(2009)
40. Chestermere FBC & Development Study
Location: Chestermere, Alberta
Size/Description: City-Wide Form Based Code (FBC) Analysis, Draft Code, and 640 Demonstration Design
Role: As Manager, Lead Designer, and Project Principal
Commentary: The project scoop, coming soon.
<2010>
41. Revelstoke Unified Development Bylaw & Development Study
Location: British Columbia
Size/Description: City-Wide Form Based Code (FBC) based on the SmartCode (SC), City-Wide master plan, and several detailed development studies. Included a 5-day charrette and follow-up implementation.
Commentary: The project scoop, coming soon.
<2010>
42. Eight Lakes (Salado II)
Location: Salado, Texas
Size/Description: 50 Acre (TND) and Mixed Use Center (MU)
Role: As Manager, Lead Designer, and Project Principal <2010>
Commentary: The project scoop, coming soon.
<2010>
43. Wind Walk
Location: Okotoks, Alberta
Size/Description: 160 acre Green TND Neighbourhood Design as the inaugural project for for Mike Holmes Communities. Included Master Plan, Form Based Code (FBC), 5-Day Charrette, Policy Plan. (Adopted, Under Construction)
Role: As Manager, Lead Designer, Project Principal, Charrette Director
Commentary: The project scoop, coming soon.
<2010> (Website)
44. Viramontes (El Cruzero)
Location: El Paso, Texas
Size/Description: 259 acre mixed use town center and TND neighbourhood under the El Paso SmartCode.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
45. Medical Centre of the Americas
Location: El Paso, Texas
Size/Description: 132 Acre SmartCode revision and regulating plan for a medical campus master plan plus a context plan for the 250 acres of surrounding neighborhoods developed as part of a 4-day charrette. All 382 acres rezoned under the El Paso SmartCode.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
46. 24 Hour Charrette: Montgomery
Location: Montgomery, Alabama
Size/Description: A pro-bono “service charrette” for selected CNU 2010 attendees to generate a redevelopment plan over a 24-hour period for a depressed area adjacent to the historic Five Points section of Montgomery and along the historic Selma to Montgomery Civil Rights Trail.
Role: Co-Designer as part of a selected pro-bono team.
Commentary: The project scoop, coming soon.
<2010>
47. Whitehall
Location: Newcastle County, Delaware
Size/Description: 822 acre TND Village and Hamlet master plan in conformance with the County’s recently adopted Unified Development Code (Based on the SmartCode). Included the “Article 3” submission for zoning approvals. (Under Construction)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
48. Lakeside at Sipsey Landing
Location: Smith Lake, Alabama
Size/Description: 60 acre mixed-use resort village on Smith Lake just outside of Birmingham, Alabama.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
49. Fitchburg, Wisconsin SmartCode
Location: Fitchburg, Wisconsin
Size/Description: City-wide SmartCode/Form Based Code calibration, detailed site design, developed through a 5-day charrette. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
50. El Paso International Airport, East Industrial Lands
Location: El Paso, Texas
Size/Description: 2090 Acre mixed-use industrial center Master Plan and SmartCode entitlement under the El Paso SmartCode (Adopted and Rezoned)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2010>
51. El Paso International Airport Master Plan
Location: El Paso, Texas
Size/Description: 400 acre mixed-use Town Center Master Plan and SmartCode entitlement under the El Paso SmartCode (Adopted and Rezoned)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2011>
52. Coaldale-Lethbridge IDS
Location: Lethbridge County, City of Coaldale, Alberta
Size/Description: Inter-Municipal Development Strategy for a Sub-Regional Scaled area (over 25,000 acres) as part of a larger consultant team fulfilling the Land Use and Smart Growth component of a comprehensive report. Included a four day charrette, land use master plan, and land use policies. (Adopted)
Role: As Manager, Lead Designer, Project Principal, Charrette Director as sub-consultant to Alvin Fritz Associates.
Commentary: The project scoop, coming soon.<2011>
53. Chamisa Verde
Location: Taos, New Mexico
Size/Description: 23 acre Neighbourhood Plan for an affordable TND and “Article 3” submission for zoning approvals under the Taos SmartCode, adminisitered through a 3-Day Charrette.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2011>
54. Mackenzie Village
Location: Revelstoke, British Columbia
Size/Description: 40 acre TND resort village as a follow-up to the Revelstoke SmartCode-based unified development code.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2011>
55. Chula Vista Center
Location: Chula Vista, California
Size/Description: Design for the renovation of the City’s central park and plaza. (Partially Constructed).
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2011)
56. Ramona FBC
Location: Ramona, California
Size/Description: Form-Based code for the downtown and main corridor for a rural San Diego County town. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2011)
57. Mission Road
Location: Calgary, Alberta
Size/Description: Corridor mixed use redevelopment plan, form based code, and charrette. (Adopted, Under Construction)
Role: Prime Consultant and overall Project Manager (Charrette conducted by Duany Plater-Zyberk & Co.), Designer, Primary Report and FBC Author, Project Principal
Commentary: The project scoop, coming soon.
(2011)
58. Springwell Garden Village
Location: Rocky View County, Alberta
Size/Description: 80 acre “Agrarian Urbanism” settlement designed as a mixed use TND supporting an intensive local agricultural industry.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
<2012>
59. Fitchburg-Tech - Nine Springs
Location: Fitchburg, Wisconsin.
Size/Description: 192 acre TOD including 57 acres of mix-industrial and technology campus. Revision and implementation of a neighborhood plan following the 2010 adoption of the Fitchburg SmartCode. (Adopted)
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2011)
60. Springville, Utah FBC and TOD
Location: Springville, Utah
Size/Description: 160 acre TOD designed in parallel with a form-based code as part of greater Salt Lake City’s transit plan.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2011)
61. Layton, Utah TND
Location: Layton, Utah
Size/Description: 160 acre TND designed in parallel with a form-based code, as part of 5-day charrette.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2011)
62. Ranson Renewed-Charlestown Connected
Location: Ranson, West Virginia
Size/Description: HUD funded Land Use/ Form Based Code component of an integrated EPA Brownfields and FHWA corridor redevelopment initiative. Included a comprehensive SmartCode (adopted) and several infill, brownfield, and large greenfield master plans with entitlements now underway.
Role: As Lead Designer/Design Manager, Project Principal
Commentary: The project scoop, coming soon.
(2011)
63. Lee Trevino Center
Location: El Paso, Texas
Size/Description: 6.5 acre mall redevelopment (suburban retrofit) into a walkable mixed use center.
Role: As Manager, Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
64. Winter Park- Fairbanks Avenue
Location: Winter Park, Florida
Size/Description: 1-Mile Long corridor redevelopment plan and design guidelines pursuant to the Winter Park SmartCode.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
65. Woodstock
Location: Woodstock, Georgia
Size/Description: City-Wide SmartCode and TND master planning.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
66. ArmorCast Town Center
Location: Birdsboro, Pennsylvania
Size/Description: 96 acre waterfront town center on former military Tank factory lands, reconnecting the local town with their waterfront through a mixed use redevelopment.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
67. Powhattan
Location: Ranson, West Virginia
Size/Description: 12 acre infill brownfield redevelopment. The mixed use plan includes 176 apartment and row house units with 50,000sf of ground floor commercial adopted under the Ransan SmartCode.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
68. Belhaven Center
Location: Jackson, Mississippi
Size/Description: Block-by-block redevelopment strategy for a disinvensted inner-city neighbourhood including a range of housing types, a mixed use district, and comprehensive public improvements.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
69. Fuquay-Verina SmartCode
Location: Fuquay-Verina, North Carolina
Size/Description: Form-Based Code to implement walkable, mixed use centers, including master plans for four mixed use catalyst sites (200 acres) as part of a week long charrette.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
70. Leland SmartCode
Location: Leland, North Carolina
Size/Description: Form-Based Code to implement walkable, mixed use centers, including master plans for four mixed use catalyst sites (200 acres) as part of a week long charrette.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2012)
71. Hogan Place, Starkville
Location: Starkville, Mississippi
Size/Description: 395 acre mixed use town center, TND, and recreational complex. Produced town plan under contract with Christian Preus landscape architecture.
Role: As Lead Designer (Town Plan)
Commentary: The project scoop, coming soon.
(2013)
72. Adelaide, Starkville
Location: Starkville, Mississippi
Size/Description: 486 acre TND. Produced town plan under sub-contract with Christian Preus landscape architecture.
Role: As Lead Designer (Town Plan)
Commentary: The project scoop, coming soon.
(2013)
73. Mahogany Town Center
Location: Calgary, Alberta
Size/Description: 36 acre walkable mixed use town center, replacing a previous conventional subdivision plan for this new community. (Adopted)
Role: As Lead Designer, Project Principal
Commentary:The project scoop, coming soon.
(2013)
74. Rumsey Green
Location: Shepherdstown, West Virginia
Size/Description: 12 acre mixed use village center master plan including 120 residential units and 120,000sf of commercial with street oriented grocery store. Form-based code for implementation (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2013)
75. CentrePort 2013
Location: Winnipeg, Manitoba
Size/Description: Land use plan, form-based zoning ordinance, and master plan for the recently designated 20,000 acre inland port serving Manitoba’s transportation, trade, manufacturing, distribution, warehousing and logistics hub.
Role: As Lead Designer, co-author of ordinance, Project Principal
Commentary: The project scoop, coming soon.
(2013-2014)
76. Kinniburgh
Location: Chestermere, Alberta
Size/Description: 12 acre adult living development organized on walkable streets and cottage courts. (Adopted)
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2013)
77. Viva Doña Ana
Location: Doña Ana County, New Mexico
Size/Description: Development of a Unified Development Code for a 3,815 square mile county in southwest New Mexico. A mobile "codes on the road" workshop worked with local communities to develop plans and shape the UDC code to create more sustainbale, place-based communities.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2013)
78. Downtown Las Cruces, New Mexico
Location: Las Cruces, New Mexico
Size/Description: Implementation-focused downtown master plan centered on the siting, configuration, and and design of a traditional New Mexican plaza. Developed through a design charrette, much of the first stage recommendations are now funded and underway including the Plaza that has been designed and fully funded.
Role: As Lead Designer, Project Principal. Geoff served as an ongoing advisor to the design development and implementation for the plaza he designed as part of the original charrette.
Commentary: The project scoop, coming soon.
(2013-2014)
79. Jackson Medical District, MS
Location: Jackson, Mississippi
Size/Description: Strategy to coordinate several downtown and central Jackson institutions and neighborhoods as a catalyst to revitalization.
Role: As Lead Designer, Project Principal
Commentary: The project scoop, coming soon.
(2013)
Small and Unpublished Projects:
Some of these projects may be introduced into the project portfolio in the future.
80. Rangeview, Calgary, AB
81. Allen Beach Resort, AB
82. Cedar Rapids, ID
83. Hilton Head/Coligny, SC
84. North Stoney + Neighborhood, Calgary, AB
85. Cranston, Calgary, AB
86. Englewood EastGate, Calgary, AB
87. Hiawatha, Kelowna, BC
88. Boyds Corner, DE
89. Hillsborough/DPZ, FL
90. 808 Center, Beaufort, SC
91. Rocky View Recycling Depot, AB
Foundational Projects
92. Seton, AB
Location: Calgary, Alberta
Size/Description: 347 ac. Mixed-Use Town Centre, Hospital Facility, and TOD
Role: Urban Design Support, Co-Designer for Master Plan.
Commentary: The project scoop, coming soon.
(2002)
93. New Longview, MO
Location: Lee's Summit, Missouri
Size/Description: 320 acre TND
Role: On Design Team for 7-Day Charrette
Commentary: The project scoop, coming soon.
(2001)
94. Wrights Point SC
Location: Beaufort, South Carolina
Size/Description: 50 ac. TND and Mixed-Use Town Centre
Role: As Lead Designer under Contract with Alison Ramsey Architects
Commentary: The project scoop, coming soon.
(2004)
95. The Village of Penland, NC
Location: Penland, North Carolina
Size/Description: Strategy to coordinate several downtown and central Jackson institutions and neighborhoods as a catalyst to revitalization.
Role: Charrette Team Designer, Illustrator in conjunction with Alison Ramsey Architects and Opticos Design.
Commentary: The project scoop, coming soon.
(2004)
96. Lakeland Green, TN
Location: Lakeland, Tennessee
Size/Description: 1,200 acre TND town design
Role: As part of charrette design team led by Duany Plater-Zyberk & Co. and including Randall Arendt;
Commentary: The project scoop, coming soon.
(2004)
97. Intown Memphis, TN
Location: Memphis, Tennessee
Size/Description: Redevelopment Plan and Charrette as part of the University of Miami’s Knight Program in Community Building.
Role: Charrette team designer and illustrator.
Commentary: The project scoop, coming soon.
(2006)
98. Mississippi Renewal Forum, MS
Location: Biloxi, Mississippi
Size/Description: Regionally scaled redevelopment plan with charrette led by Andres Duany of Duany Plater-Zyberk & Company. The charrette focused on rebuilding the coastal communities of Mississippi six weeks after Hurricane Katrina's devastation.
Role: Urban Designer and Illustrator on team focused on Bay St. Louis in conjunction with Bill Dennis
Commentary: The project scoop, coming soon.
(2005)
99. Meriam Park, CA
Location: Chico, California
Size/Description: 250 ac. TND Town Plan, 7-Day Charrette hosted by New Urban Partners (the generous developers and primary risk holders) for a charrette team led by Opticos Design, and a charrette design team led by Leon Krier; Designer
Role: Charrette team designer.
Commentary: The project scoop, coming soon.
(2004)
100. Las Catalinas, Costa Rica
Location: Guanacaste, Costa Rica
Size/Description: 600 acre+ resort village, charrette; illustration and design
Role: Charrette team designer and illustrator. Charrette led by Bill Dennis, Master Plan Tunnell-Spangler-Walsh and Associates, Lead Designer Douglas Duany
Commentary: The project scoop, coming soon.
(2007)